Create Safe Access from Crescent Rim Drive:
The Peasley Stairway

This stairway with a bike runnel will connect Crescent Rim Drive with the park at Peasley Street. It will create safe, off-road access to the park and downtown Boise. A runnel is a grooved trough for cyclists to push their bicycles up or down.

We received an Open Spaces and Clean Water Committee grant which completes the funding of the project. Construction has  commenced  and our goal is to finish the project sometime in 2025. Click here for more details.

20250205_133052.jpg

Restore the Clock & Tower

The clock will be relocated out of the sports fields to a central location just east of the fountain. To revitalize the clock tower, we will give it a fresh coat of paint. We plan to return a nostalgic feel by purchasing recreations of the four analog clock faces originally placed in the park by Ann Daly Morrison's family.

20250219_092955.jpg
IMG_4966.jpeg

Revamp Riverfront Area

Although this project is still in the planning stage, there are several concepts under consideration. This image shows an expanded takeout area on both the east and west side of Pioneer Bridge with a ramp for ease of egress.

Boise River Takeout Concept-image for website.png
Concept drawing created by Burroughs Group

Improve Park Entries

By adding a wave roofline entryway similar to designs found in Palm Springs, iconic home of mid-century modern design, we desire to keep the park's mid-century modern roots. We will also improve the entryways at Royal Boulevard and Ann Morrison Drive with signs that complement the grand entrance at Americana Boulevard.

Entryway designed by Jason Keeble at Trademark Design.